Static consolidation of the cortical treatment on the bridge at km.16+246 over the Pedogna torrent at the Diecimo-Pescaglia station on the Lucca-Aulla line.
Rete Ferroviaria Italiana S.P.A
201,562 €
Stazione di Pescaglia-Diecimo di Lucca
2017
Complete cortical treatment of the surface of the reinforced concrete structures, part of the load-bearing beams of the bridge, including final protective painting.