Installation of catenary conductors and switches on the Pragersko-Hodos line. The electrification of the Pragersko-Hodos section on behalf of the Slovenian Ministry of Infrastructures was successfully carried out with a 440 sq. mm. contact line and the installation of switch-disconnectors with 25 kV insulation.
Republic of Slovenia Ministry of Infrastructure