Construction of sorting stations on the bridge at km 60+000
METAL AND STEELWORK CARPENTRY

Construction of sorting stations on the bridge at km 60+000

Scope

New sorting stations for plano-altimetrical correction of the track located on the curved bridge at Borgotaro.

Commissioned by

R.F.I. SPA

Budget

600,000 €

Location

BORGO VAL DI TARO (PARMA)

Year

2016

These have the function of inclining the train towards the inside of the curve, in order to make the passengers feel less of the centrifugal force. The inclination has been determined on the basis of a topographic plano-altimetric survey of the curve and subsequent study of the section.

The structure was made in galvanized steel at our Cemes factory. It has also been designed by our technical department and installed on site by our specialized staff with our own railway vehicles.