Works on the metallic beams at km.60+010 (bridge on the river Taro) of the Parma-Vezzano Ligure line, as well as complementary and additional works phase 1,2,3,4.
Rete Ferroviaria Italiana S.P.A
2,096,688 €
Stazione ferroviaria di Borgotaro
2019-20
Installation of contrasting/confining elements to stop the displacement/loosening of the contact plates at the base of the current support elements perimetrically to the current plates, between the supports and the concrete/masonry pulvinus, in order to avoid the continuation of the localized subsidence phenomena (dimpling, lateral displacement) of the supports themselves.